Deng Xiaoping Logistics Complex

Deng Xiaoping Logistics Complex is the largest logistics terminal in Russia

16 km
The length of the railway tracks
65 ha
Total area
100 000 TEU/year
Cargo turnover capacity
+ + +

Class-A warehouse with total area of 100,000 m²


On the premises of the Class-A logistics complex spanning 100,000 square meters, high storage standards are embodied. Within this facility, there is a dedicated warehouse for temperature-controlled cargo, encompassing over 2,500 square meters and maintaining a temperature range from -27 to +8 °C. Additionally, the complex features a third-party logistics (3PL) warehouse boasting a capacity exceeding 150,000 pallets. This warehouse is outfitted with an address storage system and an automated cargo distribution system. Catering to e-commerce (E-com) needs, a warehouse comprising more than 250,000 cells is available. A key component of this project is the warehouse designed for oversized cargo, featuring gates standing at 12 meters high. Furthermore, the complex houses a warehouse specifically designated for hazardous goods, covering a total area of 5,760 square meters. This facility is equipped to handle goods from nearly all hazard classes except for the 1st and 7th classes.

Cross docking zone with total area of 4000 m²


The cross-docking zone is a strategically vital location where goods are consolidated and swiftly reloaded to facilitate fast and efficient transit. This area plays a pivotal role in optimizing logistics processes, guaranteeing the seamless and precise movement of goods throughout the complex.

Washing and steaming station and storage area of tank containers


The washing and steaming station within the logistics complex is specifically designed to cleanse tank containers of any contamination before they are reused. With state-of-the-art equipment and stringent process control measures in place, this facility guarantees high-quality cleaning standards.

The storage area for tank containers serves as a temporary location, offering a secure and organized space for these containers until the next stage of transportation. This area plays a crucial role in maintaining the efficiency of the supply chain by ensuring that the containers are prepared for subsequent use.

Railway terminal services sales start in May 2024

Location

Construction progress

277 days
Construction in progress
500 people
Working at the site
17 000 piles
Hammered
06. - 07.2023
08.2023
09. - 11.2023
12. 2023